GSA2522

Quality Review

Agency
GSA
Revision
Rev. 7/1994
Fillable fields
75
Pages
2
Official source
GSA form page
Checked
October 20, 2026
Fill GSA2522 online
Page 1 of form GSA2522

GSA Form 2522: Quality Review

GSA Form 2522, Quality Review, is a General Services Administration form with instructions on its second page. The footer reads GSA FORM 2522 (REV. 7-94) and Prescribed by FSS P 2901.5, and GSA hosts it in its forms library.

The form records a review of a supplier taking part in Source Inspection by Quality Approved Manufacturer (SIQAM). The instructions say to audit and evaluate the adequacy and compliance of the system by observing and reviewing the contract requirements, technical documents, and the supplier's documented quality system and related process control records. It then records a check of inspection and test results for a product, any unsatisfactory conditions and the corrective action to be taken.

The QAS or LQAS signs item 13, and the SQAS or a delegated LQAS signs item 14 after review. The form does not spell out these titles. You can fill it out free in your browser on this page and download the result without an account.

Top of page 1 of GSA Form 2522: Quality Review, as printed by GSA

What's on GSA Form 2522

Items 1 to 4: supplier and contracts

The supplier, company officials contacted, any prime contractor, and the contract numbers and specifications reviewed.

Item 5: the supplier's practices

Yes or no questions on completing and distributing SIQAM certificates, notifying the ACO, following written inspection and test procedures, keeping inspection records, segregating rejected materials and calibrating equipment.

Items 6 to 9: procedures, changes and the system

Whether test procedures reflect the specification revisions, changes since the last review, verification of earlier corrective actions, whether the system meets Federal Standard 368, and the date of the last complete review.

Item 10: comments

Explanations of NO answers to questions 5, 6, 7B, 7C, 8, 9A and 9B, and of a YES answer to question 7A.

Item 11: inspection and test results

Nomenclature, national stock number, order numbers and quantity, then compliance (C) or noncompliance (NC) for product inspection, tests and preparation for delivery, the verification method and whether findings are attached.

Items 12 to 14: findings and signatures

Unsatisfactory conditions, corrective action to be taken (with the QDN number and date if one is issued), and the QAS and supervisor signatures.

How to complete GSA Form 2522

  1. 1

    Identify the supplier and contracts

    Enter the name, address and ZIP code of the SIQAM supplier in item 1. The instructions call items 2 to 4 self explanatory.

  2. 2

    Answer items 5 to 9B

    Check yes, no or annotate nonapplicable (N/A) as appropriate, and enter the date of the last complete review in subitem 9C.

  3. 3

    Explain in item 10

    Explain any NO answer to questions 5, 6, 7B, 7C, 8, 9A and 9B and a YES answer to question 7A.

  4. 4

    Record the product checked

    The instructions say item 11 entries refer to the product being audited at the time of review: the item name, national stock numbers, purchase order numbers and total quantity, then compliance or noncompliance and an X for the verification method.

  5. 5

    Attach findings and note conditions

    Check yes or no for attached manufacturer's findings and supporting documentation, attach them, explain unsatisfactory conditions in 12A, and give the supplier's corrective actions in 12B.

  6. 6

    Sign and review

    The QAS/LQAS signs or identifies and dates item 13. After review, the SQAS or delegated LQAS signs and dates item 14.

The instructions on page 2 cover each item.

Why fill Form GSA2522 on indox

You get the real form, filled in a browser tab, with nothing standing between you and the finished PDF.

  • Fill the form right in your browser, no software to install
  • Free to fill and free to download, with no account
  • The official blank straight from the GSA, not a copy someone retyped
  • Works on a phone, tablet or computer

Routing and what the form says

Where it goes

The form prints no address. It ends with the QAS signature and the supervisor's review in items 13 and 14.

Extra space

The form says to continue on a separate sheet, referencing the item numbers continued.

Electronic transmission

The item 13 instruction allows the QAS/LQAS to individually identify, for example by identification number, for electronic form transmissions instead of signing.

Edition and prescription

The footer reads GSA FORM 2522 (REV. 7-94) and Prescribed by FSS P 2901.5. GSA's page lists a current revision date of 07/1994 and FSS P 2901.5.

What the form does not print

No OMB number or privacy statement, and no explanation of QAS, LQAS, SQAS, ACO, QDN or PP&M.

Who fills out GSA Form 2522?

  • The QAS or LQAS

    Item 13 is for the QAS's number, signature and date. The instructions say the QAS/LQAS signs, or otherwise individually identifies (e.g., by identification number) for electronic form transmissions, and dates the form.

  • The SQAS or delegated LQAS

    Item 14 is headed SUPERVISOR. The instructions say that after review the SQAS or delegated LQAS signs and dates the form.

  • The SIQAM supplier

    Item 1 is the name, address and ZIP code of the SIQAM supplier, and item 2 the company officials contacted, by name and title.

  • A prime contractor and the ACO

    Item 3 names the prime contractor if different from the supplier. Item 5C asks whether the supplier is notifying the ACO of problems.

The instructions on page 2 assign items 13 and 14. The supplier is the subject of the review and has no block to sign.

Official sources and the blank

Do it all with indox

View all 94 tools

Questions about Form GSA2522

Who issues GSA Form 2522?

The footer reads GENERAL SERVICES ADMINISTRATION, GSA FORM 2522 (REV. 7-94) and Prescribed by FSS P 2901.5. GSA hosts it in its forms library.

Who signs GSA Form 2522?

The QAS or LQAS signs and dates item 13, and after review the SQAS or a delegated LQAS signs and dates item 14, which is headed SUPERVISOR. The supplier has no signature block.

What does SIQAM stand for?

Item 5A spells it out as Source Inspection by Quality Approved Manufacturer.

Which answers need an explanation?

Item 10 asks for an explanation of NO answers to questions 5, 6, 7B, 7C, 8, 9A and 9B, and of a YES answer to question 7A.

What standard does the form name?

Item 9A asks whether the system meets requirements of Federal Standard 368.

How is a test result verified on the form?

Item 11G records the verification method used by the QAS with an X: witnessed, conducted, GSA laboratory or destination inspection requested.

What if an answer needs more space?

The form says to continue on a separate sheet, referencing the item numbers continued.