Home and inspector details
Case number, location and serial number of the manufactured home, name of inspector, name and address of firm and telephone number.
26-8731b
Electrical Systems Inspection Report (Manufactured Home)
VA Form 26-8731b is the U.S. Department of Veterans Affairs Electrical Systems Inspection Report (Manufactured Home). It is completed and signed by an inspector, and the form has no place for a Veteran or purchaser to sign. A note to the inspector on the form says all inspections must be completed following installation and set-up.
The form is one page. It records the case number, the location and serial number of the home and the inspector's details. The certification of electrical system describes a dielectric strength test, a continuity test, an operational test, polarity checks and a visual inspection of aluminum wiring connections, then asks one question: wiring satisfactory, yes or no. The inspector certifies having no interest present or prospective in the system and signs with a license number.
VA's page lists the form under housing assistance. You can fill out the PDF free in your browser on this page and download the result without an account.

Case number, location and serial number of the manufactured home, name of inspector, name and address of firm and telephone number.
A 1 minute, 900-volt test with all switches closed between live parts, including neutral, and the home's ground, or 1,080 volts for 1 second. It is done after branch circuits are complete and fixtures or appliances are installed. Listed fixtures or appliances are not required to withstand it.
A continuity test that metallic parts are properly bonded, an operational test that all equipment is connected and in working order, and polarity checks that connections have been properly made.
A visual inspection of all connections to switches, plugs and similar parts. The form says loose connections must be tightened.

One yes or no answer for the electrical system as a whole.
A federal penalty statement, the inspector's certification, the date, the signature of inspector and the license number.
The note to inspector on the form says all inspections must be completed following installation and set-up.
Enter the case number, the home's location and serial number, and the inspector's and firm's details.
The form describes the dielectric strength test in paragraph (a) and the continuity, operational and polarity tests in paragraph (b) that each home is subjected to.
The form calls for a visual inspection of all connections to switches and plugs.
Mark yes or no in the Wiring Satisfactory box.
Enter the date, sign as inspector and add the license number.
You get the real form, filled in a browser tab, with nothing standing between you and the finished PDF.
The form and VA's page give no mailing address or filing instructions.
VA's page offers the form as a downloadable PDF and lists no online version.
VA also publishes VA Form 26-8731a, Water-Plumbing Systems Inspection Report (Manufactured Home), and VA Form 26-8731c, Fuel and Heating Systems Inspection Report (Manufactured Home).
The form is dated JAN 2001 and supersedes VA Form 26-8731b, APR 1998, which will not be used.
26-8731a
19 fields, 1 page
26-8731c
19 fields, 1 page
26-8730
19 fields, 1 page
26-8712
94 fields, 1 page
26-8644
20 fields, 1 page
26-8641a
51 fields, 1 page
The form opens with a note to the inspector and asks for the inspector's name, signature and license number.
It asks for the name and address of the firm and a telephone number including area code.
The inspector certifies having carefully inspected the system, having no interest present or prospective in it, and having reported all observed conditions.
The form has one signature line, for the inspector, and no part for a Veteran, purchaser or dealer.
The form's penalty statement refers to any guaranty or insurance or the granting of any loan by the Secretary. It prints no mailing address.
The form is addressed to the inspector.
The agency’s own page for Form 26-8731b.
The official blank form, to print or fill by hand.
No tool matches that search.
It is an inspection report on the electrical systems of a manufactured home, completed and signed by an inspector.
The note to inspector on the form says all inspections must be completed following installation and set-up.
The form describes a 1 minute, 900-volt dielectric strength test with all switches closed, or alternatively a test at 1,080 volts for 1 second.
Yes. It calls for a visual inspection of all connections to switches, plugs and similar parts, and says loose connections must be tightened.
That the inspector carefully inspected the system, has no interest present or prospective in it, and reported all observed conditions.
Neither the form nor VA's page gives a mailing address or filing instructions.