SF330Extr1

Extra Part 1 of SF330

Agency
GSA
Revision
Rev. 7/2021
Fillable fields
364
Pages
5
Official source
GSA form page
Checked
October 20, 2026
Fill SF330Extr1 online
Page 1 of form SF330Extr1

Standard Form 330 (SF 330): Extra Part I, Contract-Specific Qualifications

This PDF is a separate copy of Part I of Standard Form 330 (SF 330), Architect-Engineer Qualifications. Its pages are headed "Part I - Contract-Specific Qualifications" and each footer reads STANDARD FORM 330 (REV. 7/2021). GSA's page lists it as Extra Part 1 of SF330, and GSA hosts it in its forms library. The pages print no issuing agency.

The five pages hold Sections A to I: contract information, the architect-engineer point of contact, the proposed team, an organizational chart box, resumes of key personnel, example projects, a matrix of key personnel against those projects, additional information and the authorized representative's signature. This copy carries the form pages only, with no instructions pages.

You can fill it out free in your browser on this page and download the result without an account.

Top of page 1 of Standard Form 330 (SF 330): Extra Part I, Contract-Specific Qualifications, as printed by GSA

What's on Extra Part I of SF 330

Page 1, Sections A and B

Items 1 to 3 ask for the contract title and location (city and state), public notice date and solicitation or project number. Items 4 to 8 name the architect-engineer point of contact.

Page 1, Sections C and D

Rows a to f for firm name, address and role in this contract, each with a Check if Branch Office box. Section D is an organizational chart of the proposed team, with an Attached box.

Page 2, Section E

Items 12 to 19: name, role, years of experience, firm name and location, education, current professional registration, other professional qualifications and relevant projects a to e.

Page 3, Section F

Items 20 to 25 for one example project: key number, title and location, year completed, project owner's information, a brief description with scope, size and cost, and the firms from Section C involved.

Page 4, Section G

Items 26 to 29: a matrix of key personnel and their roles against example projects 1 to 10, followed by the Example Projects Key.

Page 5, Sections H and I

Item 30 for additional information requested by the agency, then items 31 to 33 for the signature, date, name and title.

How to complete Extra Part I of SF 330

  1. 1

    Enter the contract information

    Fill in the title and location (city and state), the public notice date and the solicitation or project number in Section A.

  2. 2

    List the proposed team

    In Section C, enter each firm's name, address and role, check Prime, J-V Partner or Subcontractor, and check the branch office box where it applies.

  3. 3

    Add one resume per key person

    Complete one Section E for each key person, with up to five relevant projects and the box to check if a project was performed with the current firm.

  4. 4

    Describe the example projects

    Section F says "Present as many projects as requested by the agency, or 10 projects, if not specified" and to complete one Section F for each project.

  5. 5

    Fill in the key before the matrix

    Section G says to fill in the Example Projects Key before completing the table, then place an X under the project key number for participation in the same or similar role.

  6. 6

    Sign Section I

    The authorized representative signs, dates and enters a name and title in items 31 to 33.

Why fill Form SF330Extr1 on indox

You get the real form, filled in a browser tab, with nothing standing between you and the finished PDF.

  • Fill the form right in your browser, no software to install
  • Free to fill and free to download, with no account
  • The official blank straight from the GSA, not a copy someone retyped
  • Works on a phone, tablet or computer

Where it goes and what the pages say

Where it goes

The pages print no filing address. Section A asks for the public notice date and the solicitation or project number, and Section H asks for information requested by the agency.

Extra sheets

Section H says "Attach additional sheets as needed." Section D has an Attached box for the organizational chart of the proposed team.

Copies

Page 1 prints "AUTHORIZED FOR LOCAL REPRODUCTION".

Edition

Each page footer reads STANDARD FORM 330 (REV. 7/2021). GSA's page lists a current revision date of 07/2021.

Who fills out Extra Part I of SF 330?

  • Architect-engineer firms

    Section B asks for an architect-engineer point of contact: name and title, name of firm, telephone, fax and e-mail address.

  • Prime contractor and key subcontractors

    Section C says "Complete this section for the prime contractor and all key subcontractors." Each row has boxes for Prime, J-V Partner and Subcontractor.

  • Key personnel

    Section E says "Complete one Section E for each key person." Each resume gives the person's role in the contract and years of experience.

  • Authorized representative

    Section I holds the signature, date, name and title of the authorized representative under the line "The foregoing is a statement of facts."

The pages carry no instructions. These are the people and firms the printed blocks ask about.

Official sources and the blank

Do it all with indox

View all 94 tools

Questions about Form SF330Extr1

What is Extra Part 1 of SF330?

It is a separate copy of Part I of Standard Form 330, Architect-Engineer Qualifications, headed "Part I - Contract-Specific Qualifications". It holds Sections A to I on five pages.

Who issues it?

The pages print no issuing agency. Each footer reads STANDARD FORM 330 (REV. 7/2021). GSA hosts it in its forms library.

Does this PDF include instructions?

No. This copy carries the five form pages only, with no instructions pages.

How many example projects does Section F hold?

Section F says to present as many projects as requested by the agency, or 10 projects, if not specified, and to complete one Section F for each project. The Section G matrix has columns 1 to 10.

Who signs it?

Section I holds the signature, date, name and title of the authorized representative under the line "The foregoing is a statement of facts."