GSA376

Elevator Inspection Report

Agency
GSA
Revision
Rev. 11/1967
Fillable fields
22
Pages
2
Official source
GSA form page
Checked
October 20, 2026
Fill GSA376 online
Page 1 of form GSA376

GSA Form 376: Elevator Inspection Report (Including Escalators and Dumbwaiters)

GSA Form 376, Elevator Inspection Report (Including Escalators and Dumbwaiters), is a General Services Administration form dated 11-67 in its footer. GSA's forms page gives a current revision date of 11/1967, and GSA hosts it in its forms library.

The instructions on the back say a separate report shall be made for each building for which PBS is responsible for elevator inspections. The front records the building, address and region, the inspection dates and the number of units. The inspector's statement says all elevators, escalators and dumbwaiters were inspected and found in a satisfactory condition, except as noted. Section A lists work the building manager or custodian is requested to have performed, and Section B lists repair and maintenance items outside the scope or responsibility of the buildings manager or custodian.

You can fill it out free in your browser on this page and download the result without an account.

Top of page 1 of GSA Form 376: Elevator Inspection Report (Including Escalators and Dumbwaiters), as printed by GSA

What's on GSA Form 376

Building and address

Building, street address, city, state and region.

Inspection dates

Date inspection ordered, date inspection started and completed, and date inspection certificates signed.

Number of units in building

Counts of passenger, FRT. OR SERV., escalator and dumbwaiter units.

Section A: work requested

Work the building manager or custodian is requested to have performed. The form says to list items that can be properly performed by force account, and to use the reverse when more space is required.

Completion signatures

The mechanic's signature, the buildings manager's signature and the date, confirming the Section A work is done and the equipment is ready for reinspection, if required.

Section B and inspector sign off

Repair and maintenance items outside the scope or responsibility of the buildings manager or custodian, then the inspector's signature, title and date.

How to complete GSA Form 376

  1. 1

    Use one report per building

    The instructions say a separate report shall be made for each building for which PBS is responsible for elevator inspections. The heading asks to read the instructions on the reverse first.

  2. 2

    Enter the building and dates

    Fill in the building, street address, city, state and region, and the dates the inspection was ordered, started, completed and the certificates were signed.

  3. 3

    Count the units

    Enter the number of passenger, FRT. OR SERV., escalator and dumbwaiter units in the building.

  4. 4

    List the Section A work

    List the work the building manager or custodian is requested to have performed, limited to items that can be properly performed by force account. Use the reverse when more space is required.

  5. 5

    List Section B items and sign

    List repair and maintenance items outside the scope or responsibility of the buildings manager or custodian. The inspector then signs, enters a title and dates the report.

  6. 6

    Distribute the copies

    The back lists copies to the Design and Construction Division as determined by regional requirements, and 2 to the Buildings Manager, forwarded through the regional Buildings Management Division.

Why fill Form GSA376 on indox

You get the real form, filled in a browser tab, with nothing standing between you and the finished PDF.

  • Fill the form right in your browser, no software to install
  • Free to fill and free to download, with no account
  • The official blank straight from the GSA, not a copy someone retyped
  • Works on a phone, tablet or computer

Copies and what the form says

Distribution of copies

The back lists the Design and Construction Division, with copies as determined by regional requirements, and the Buildings Manager, with 2 copies forwarded through the regional Buildings Management Division.

Return copy

The instructions say one copy is to be signed by the mechanic and the Buildings Manager upon completion of the work listed in Section A, and returned to the inspector.

Authority

GSA's forms page lists no authority or regulation for this form. The PDF prints no OMB number, address or privacy statement.

Edition

The footer reads GSA FORM 376 (11-67). GSA's forms page gives the current revision date as 11/1967.

Who fills out GSA Form 376?

  • The inspector

    The inspector signs and dates the report and enters a title. The statement says the units were inspected by the undersigned inspector on the date noted.

  • The mechanic

    The mechanic signs under the line THE WORK DESCRIBED ABOVE HAS BEEN COMPLETED, AND THE EQUIPMENT IS READY FOR REINSPECTION, IF REQUIRED.

  • The buildings manager or custodian

    Section A requests the building manager or custodian to have the listed work performed. The buildings manager signs and dates the completion line beside the mechanic.

  • Design and Construction Division

    The back says copies go to the Design and Construction Division, as determined by regional requirements.

The form has signature lines for three roles, and the back lists who receives copies.

Official sources and the blank

Do it all with indox

View all 94 tools

Questions about Form GSA376

Who issues GSA Form 376?

The footer reads GENERAL SERVICES ADMINISTRATION, GSA FORM 376 (11-67). GSA hosts it in its forms library.

Does GSA Form 376 cover escalators and dumbwaiters?

Yes. The heading says Including Escalators and Dumbwaiters, and the unit count has columns for passenger, FRT. OR SERV., escalator and dumbwaiter units.

What is the difference between Section A and Section B?

Section A lists work the building manager or custodian is requested to have performed, limited to items that can be properly performed by force account. Section B lists repair and maintenance items outside the scope or responsibility of the buildings manager or custodian.

Is one report enough for several buildings?

The instructions say a separate report shall be made for each building for which PBS is responsible for elevator inspections.

What if Section A needs more space?

The form says to use the reverse when more space is required.

Which copy goes back to the inspector?

The instructions say one of the Buildings Manager's copies is signed by the mechanic and the Buildings Manager when the Section A work is completed, and returned to the inspector.