GSA3686B

Certificate of Occupancy

Agency
GSA
Revision
Rev. 9/2006
Fillable fields
27
Pages
2
Official source
GSA form page
Checked
October 20, 2026
Fill GSA3686B online
Page 1 of form GSA3686B

GSA Form 3686B: Certificate of Occupancy

GSA Form 3686B, Certificate of Occupancy, is a U.S. General Services Administration form. Its footer reads GENERAL SERVICES ADMINISTRATION, GSA 3686B 9/2006, and GSA hosts it in its forms library. It is an internal GSA building record, not a form the public files.

The form says the certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building it names, to provide a reasonable degree of safety to the occupants from fire and similar emergencies. It also says the certificate is valid only for the premises of the project address.

The form has 22 numbered lines, and the back page gives instructions for each one. Line 20 names the GSA Approving Official, which the instructions identify as the GSA Regional Fire Protection Engineer. You can fill it out free in your browser on this page and download the result without an account.

Top of page 1 of GSA Form 3686B: Certificate of Occupancy, as printed by GSA

What's on GSA Form 3686B

Lines 1 to 4: certificate and property

The certificate number, then the official building property name, street address, and city, state and zip code.

Lines 5 and 6: project manager and area

The GSA Project Manager for the project and the specific area of the building the certificate covers.

Lines 7 to 10: uses and occupancies

Approved and previous uses of the building, and approved and previous occupancies. The instructions give Business as an example of an occupancy.

Lines 11 to 13: type, area and occupant load

The type of work, the occupied area in gross square feet, and the design occupant load, the maximum number of occupants permitted by Code for that area.

Lines 14 to 17: sprinklers, code and construction

Whether sprinklers are required and installed, the building code name and edition at the time of contract award, and the type of construction.

Lines 18 to 22: use, stipulations and approval

A description of how all portions of the building will be used, any special stipulations or code modifications, and the approving official's name, signature and date.

The 22 lines fall into these groups.

How to complete GSA Form 3686B

  1. 1

    Build the certificate number

    The instructions say to begin with the letter F (for Final), followed by the 8 digit GSA Building Number designation and the certificate date, for example F-DC0031ZZ-01232006.

  2. 2

    Enter the property and project

    List the official property name, street address, city, state and zip code, the GSA Project Manager and the specific area of the building the certificate applies to.

  3. 3

    Record uses and occupancies

    List the approved and previous uses, and the approved and previous occupancies, then check New Construction, Renovation or Change of Occupancy on line 11.

  4. 4

    Give area, load and sprinkler details

    Enter the occupied area in gross square feet and the design occupant load. For several areas or floors, the instructions say to give the maximum for each one. Check Yes or No for sprinklers required and installed.

  5. 5

    Name the code and construction type

    List the building code and edition in effect at the time of contract award, for example 2006 ICC, and the type of construction under that code, for example Type IA.

  6. 6

    Describe use, then approve

    Describe how all portions of the building will be used and list any special stipulations or code modifications. The GSA Approving Official is named, signs and dates lines 20 to 22.

These steps follow the line by line instructions printed on the back of the form.

Why fill Form GSA3686B on indox

You get the real form, filled in a browser tab, with nothing standing between you and the finished PDF.

  • Fill the form right in your browser, no software to install
  • Free to fill and free to download, with no account
  • The official blank straight from the GSA, not a copy someone retyped
  • Works on a phone, tablet or computer

What the certificate says

What it certifies

The form says all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building named on it.

Where it is valid

The form prints: THIS CERTIFICATE IS VALID ONLY FOR THE PREMISES OF THE PROJECT ADDRESS.

Where it goes

The PDF gives no filing address or routing. GSA's page lists no authority or regulation for the form, and the PDF prints no OMB number or Privacy Act notice.

Who uses GSA Form 3686B?

  • The GSA Approving Official

    Lines 20 to 22 hold the name, signature and date of the GSA Approving Official. The instructions identify this person as the GSA Regional Fire Protection Engineer.

  • The GSA Project Manager

    Line 5 lists the name of the GSA Project Manager for the project the certificate covers.

  • New construction, renovation or change of occupancy

    Line 11 has three boxes, New Construction, Renovation and Change of Occupancy. The instructions say to check the appropriate one.

  • One specific area of a building

    Line 6 names the specific area of the building where the certificate applies, and the form says it is valid only for the premises of the project address.

The instructions on the back of the form name the GSA roles on the certificate. The form prints no other filer.

Official sources and the blank

Do it all with indox

View all 94 tools

Questions about Form GSA3686B

Who issues GSA Form 3686B?

The form's footer reads GENERAL SERVICES ADMINISTRATION, GSA 3686B 9/2006. GSA hosts it in its forms library.

Who signs the Certificate of Occupancy?

The GSA Approving Official, who the instructions identify as the GSA Regional Fire Protection Engineer, gives a name on line 20, signs on line 21 and dates it on line 22.

How is the certificate number written?

The instructions say to begin with the letter F (for Final), followed by the 8 digit GSA Building Number designation and the certificate date, for example F-DC0031ZZ-01232006.

What does the certificate cover?

Line 6 names the specific area of the building the certificate applies to. The form says it is valid only for the premises of the project address.

What is the design occupant load on line 13?

The instructions say it is the maximum number of occupants permitted by Code for the specific area of the building. For a building with multiple areas or floors, the maximum is given for each one.

Which building code edition goes on line 16?

The instructions say to list the applicable building code and edition in effect at the time of contract award, and give 2006 ICC as an example.